Navigating our future
a transportation network that connects us
2023 highlights
City of Guelph is prioritizing transitioning fleet vehicles from gas powered to electric
The City of Guelph owns and operates a fleet of more than 1,000 powered vehicles and equipment assets used by 15 service areas. To support renewable energy and to become more environmentally sustainable, the City has been exploring ways to incorporate clean and efficient energy into its fleet.
Shaping the future of transportation in Guelph
Since the updated Transportation Master Plan was approved in January 2022, it has begun shaping the future of transportation in Guelph. It defines how residents and visitors will move around the city over the next three decades.
Enhancing Road Safety with Automated Speed Enforcement cameras
The City of Guelph began using ASE cameras in August 2023. Cameras were placed in school zones because they have high volumes of pedestrians and cyclists. One of the most effective ways to reduce the severity of a collision is by reducing vehicle speed.
Initiatives
What do these colours mean?
Green – met target | Data is trending in the desired target direction. |
Red – did not meet target | Data is not trending in the desired target direction. |
Yellow – not available at time of publishing | Data is not available for the 2023 Progress Report but will likely be reported by or in the next Progress Report. |
Grey – will not be reported | Data has not been reported in the past or current Progress Report and is unlikely to be reported in the next Progress Report. |
Purple – baseline year | Data is being used to establish a baseline target for future reporting. |
Key performance indicators
What do these colours mean?
Scope
Status | Overall status | Definition |
---|---|---|
Green | All aspects of initiative status are progressing according to the plan or targets. |
|
Yellow | Initiative status has deviated from the plan or targets (within “yellow” tolerance), but under control (no risk) and mitigation plans in place to return to green. |
|
Red | Initiative status is significantly deviated from the plan (beyond “yellow” tolerance) and is at risk. Initial plans are unlikely to be achieved, requiring Executive Team support or approval to revise the plan. |
|
Schedule
Status | Overall status | Definition |
---|---|---|
Green | All aspects of initiative status are progressing according to the plan or targets. |
|
Yellow | Initiative status has deviated from the plan or targets (within “yellow” tolerance), but under control (no risk) and mitigation plans in place to return to green. |
|
Red | Initiative status is significantly deviated from the plan (beyond “yellow” tolerance) and is at risk. Initial plans are unlikely to be achieved, requiring Executive Team support or approval to revise the plan. |
|
Budget
Status | Overall status | Definition |
---|---|---|
Green | All aspects of initiative status are progressing according to the plan or targets. |
|
Yellow | Initiative status has deviated from the plan or targets (within “yellow” tolerance), but under control (no risk) and mitigation plans in place to return to green. |
|
Red | Initiative status is significantly deviated from the plan (beyond “yellow” tolerance) and is at risk. Initial plans are unlikely to be achieved, requiring Executive Team support or approval to revise the plan. |
|